Things are moving at a fast speed! Fireplace to be installed today.
Mucho insulation, mucho discomfort?
Dang, that is a lot of insulation.
Up with the insulation, damn the itchiness.
Electrical done with bonding . . . don't ask. Working with #4 copper and #6 copper is not fun . . . only later to find out I could have used #6 and #8. For those like me, bonding is grounding your gas and water line to the floating ground in the subpanel. We were also required to ground the "jetted whirlpool" motor. A bit excessive, but anything to please the inspector. And, no, he doesn't take bribes.
View from bedroom.
Insulation done in bedroom! Not as bad as I thought it would be.

Dang, that is a lot of insulation.
Up with the insulation, damn the itchiness.
Electrical done with bonding . . . don't ask. Working with #4 copper and #6 copper is not fun . . . only later to find out I could have used #6 and #8. For those like me, bonding is grounding your gas and water line to the floating ground in the subpanel. We were also required to ground the "jetted whirlpool" motor. A bit excessive, but anything to please the inspector. And, no, he doesn't take bribes.
View from bedroom.
Insulation done in bedroom! Not as bad as I thought it would be.

1 Comments:
Hey guys! We didn't know you had a blog! We're so excited to see what's up. We'll be checking in . . .
-Matt & Karin
Post a Comment